Română (România)French (Fr)Español (spanish formal Internacional)English (United Kingdom)

Roads

PUERTOLLANO (Ciudad Real) east link road turnoff construction

Variante de Puertollano (Ciudad Real)The petrochemical development in Puertollano is the most complete and the one with the biggest conversion capacity in Spain, it generates a lot of vehicles traffic which contains dangerous goods, that is why a road was built in order to avoid the town´s interior traffic.

Read more...
 

CM – 413 road surface´s reinforcement, in the stretch ALDEA DEL REY – ARGAMASILLA DE CALATRAVA (Ciudad Real)


The reinforcement consists on regularizing the old road´s slope, draining its surface by recycling old materials.

Read more...
 

New link roads between VIÑEDOS dual carriageway and CM-420

The main aim of the construction of two turnoffs in Herencia and Campo de Criptana was to avoid the truck traffic, improving both the smooth flow and inhabitants safety.

Read more...
 

South West A-5 (TALAVERA DE LA REINA – OROPESA) dual carriageway´s road surface restoration with bituminous mixing

This work took place without road closures, through a road surface mill which is between 6 y 15 cms thick, in order to obtain a plain surface in which to lay a new road surface..

Read more...
 

Road CM-410, ORGAZ (Toledo), new turoff

Heavy vehicles traffic problems in Orgaz´s road, required the construction of a road which works as a link between N-401 and Viñedos dual carriageway.

Read more...
 

Road CR-501 new route in the stretch afected by MONTORO (Ciudad Real) reservoir´s screed

Montoro´s reservoir increase makes it necessary to build a new road in CR- 501, which links Puertollano to Mestanza and Solana del Pino.

Read more...
 


Aglomancha Avda Alfonso X el Sabio 1, 1º C
13001 - Ciudad Real
España
+34926273083
+34926273073