Română (România)French (Fr)Polish (Poland)Español (spanish formal Internacional)English (United Kingdom)

Project and implementation of ARGAMASILLA DE ALBA AND TOMELLOSO´S (CIUDAD REAL) sewage water drainage and treatment works

 

The Tomelloso- Argamasilla Sewage plant extension and the construction of a main sewer which transports the waste from the present E.D.A.R. to the new E.D.A.R. allows the sewage treatment from the two towns

 

 

  • This extension allows the pretreatment of water from city center, as well as to pump and to lead the new sewage to the new E.D.A.R.
  • The new E.D.A.R. occupation surface has an area of 50.277m2.

 

 

  • It has been designed for 141.000 inhabitants and a 24.000m3/day discharge.
  • A biological treatment using active clay in a double-stage process is used for depuration.
  • The sewer pipelines in Tomelloso are made of concrete, it is 2.500 mm in diameter and 2.483 mtrs long.

 

 

Aglomancha Avda Alfonso X el Sabio 1, 1º C
13001 - Ciudad Real
España
+34926273083
+34926273073